Search This Blog

Showing posts with label Informaion Systems. Show all posts
Showing posts with label Informaion Systems. Show all posts

Monday, May 16, 2011

Directory List Box






·         The directory list box displays an ordered, hierarchical list of the user's disk directories and sub directories.  The directory structure is displayed in a list box.  Like, the drive list box, little coding is needed to use the directory list box - Visual Basic does most of the work for us.

·         Directory List Box Properties:

Path                       Contains the current directory path.

·         Directory List Box Events:

Change                  Triggered when the directory selection is changed.



.

Saturday, May 14, 2011

Control structures - 1.Branching - 1. IF Statement ;- Example


Savings Account - 



1.   Note the acceptable ASCII codes are 48 through 57 (numbers), 46 (the decimal point), and 8 (the backspace key).  In the code, we use symbolic constants for the numbers and backspace key.  Such a constant does not exist for the decimal point, so we will define one with the following line in the general declarations area:

      Const vbKeyDecPt = 46
     
2.      Add the following code to the three procedures:  txtDeposit_KeyPress, txtInterest_KeyPress, and txtMonths_KeyPress.

      Private Sub txtDeposit_KeyPress (KeyAscii As Integer)
      ‘Only allow number keys, decimal point, or backspace
      If (KeyAscii >= vbKey0 And KeyAscii <= vbKey9) Or KeyAscii = vbKeyDecPt Or KeyAscii = vbKeyBack Then
        Exit Sub
      Else
       KeyAscii = 0
       Beep
      End If
      End Sub
     
      Private Sub txtInterest_KeyPress (KeyAscii As Integer)
      ‘Only allow number keys, decimal point, or backspace
      If (KeyAscii >= vbKey0 And KeyAscii <= vbKey9) Or KeyAscii = vbKeyDecPt Or KeyAscii = vbKeyBack Then
        Exit Sub
      Else
       KeyAscii = 0
       Beep
      End If
      End Sub
     
      Private Sub txtMonths_KeyPress (KeyAscii As Integer)
      ‘Only allow number keys, decimal point, or backspace
      If (KeyAscii >= vbKey0 And KeyAscii <= vbKey9) Or KeyAscii = vbKeyDecPt Or KeyAscii = vbKeyBack Then
        Exit Sub
      Else
       KeyAscii = 0
 Beep
      End If
      End Sub
     
(In the If statements above, note the word processor causes a line break where there really shouldn’t be one.  That is, there is no line break between the words Or KeyAscii and = vbKeyDecPt.  One appears due to page margins.  In all code in these notes, always look for such things.)

3.      Rerun the application and test the key trapping performance.
.

Thursday, April 21, 2011

Steps of System Development Life Cycle 2

Initiation Phase

 



The initiation of a system (or project) begins when a business need or opportunity is identified. A Project Manager should be appointed to manage the project. This business need is documented in a Concept Proposal. After the Concept Proposal is approved, the System Concept Development Phase begins.

 

 

 

System Concept Development Phase

 

Once a business need is approved, the approaches for accomplishing the concept are reviewed for feasibility and appropriateness. The Systems Boundary Document identifies the scope of the system and requires Senior Official approval and funding before beginning the Planning Phase.

Planning Phase

The concept is further developed to describe how the business will operate once the approved system is implemented, and to assess how the system will impact employee and customer privacy. To ensure the products and /or services provide the required capability on-time and within budget, project resources, activities, schedules, tools, and reviews are defined. Additionally, security certification and accreditation activities begin with the identification of system security requirements and the completion of a high level vulnerability assessment.

Requirements Analysis Phase

 


Functional user requirements are formally defined and delineate the requirements in terms of data, system performance, security, and maintainability requirements for the system. All requirements are defined to a level of detail sufficient for systems design to proceed. All requirements need to be measurable and testable and relate to the business need or opportunity identified in the Initiation Phase.

Design Phase

The physical characteristics of the system are designed during this phase. The operating environment is established, major subsystems and their inputs and outputs are defined, and processes are allocated to resources. Everything requiring user input or approval must be documented and reviewed by the user. The physical characteristics of the system are specified and a detailed design is prepared. Subsystems identified during design are used to create a detailed structure of the system. Each subsystem is partitioned into one or more design units or modules. Detailed logic specifications are prepared for each software module.

Development Phase

The detailed specifications produced during the design phase are translated into hardware, communications, and executable software. Software shall be unit tested, integrated, and retested in a systematic manner. Hardware is assembled and tested.

Integration and Test Phase

 




The various components of the system are integrated and systematically tested. The user tests the system to ensure that the functional requirements, as defined in the functional requirements document, are satisfied by the developed or modified system. Prior to installing and operating the system in a production environment, the system must undergo certification and accreditation activities.

Implementation Phase

The system or system modifications are installed and made operational in a production environment. The phase is initiated after the system has been tested and accepted by the user. This phase continues until the system is operating in production in accordance with the defined user requirements.

Operations and Maintenance Phase

 



 

The system operation is ongoing. The system is monitored for continued performance in accordance with user requirements, and needed system modifications are incorporated. The operational system is periodically assessed through In-Process Reviews to determine how the system can be made more efficient and effective. Operations continue as long as the system can be effectively adapted to respond to an organization’s needs. When modifications or changes are identified as necessary, the system may reenter the planning phase.

Disposition Phase

The disposition activities ensure the orderly termination of the system and preserve the vital information about the system so that some or all of the information may be reactivated in the future if necessary. Particular emphasis is given to proper preservation of the data processed by the system, so that the data is effectively migrated to another system or archived in accordance with applicable records management regulations and policies, for potential future access


.

Wednesday, April 20, 2011

Steps of System Development Life Cycle



·           Identifying the problem (user requirement)
·           Feasibility Study
·           System Analysis
·           System Design
·           Software Development
·           Testing
·           Implementation
·           Maintenance







 

 

 

Identifying the problem (user requirement)

 



 

The initiation of a system begins when a business need or opportunity is identified. this is called identifying the problem. A Project Manager should be appointed to manage the project. This business need is documented in a Concept Proposal. After the Concept Proposal is approved, the System Development Phase begins.

Feasibility Study

Phase Two of the SDLC is a Feasibility study.  It's known what the system is to accomplish, now it needs to be decided if the system CAN be built feasibly.  Feasibility is based on three main factors.
1.      Do we have the technology to construct the system we want?
2.      Is the project fiscally possible (i.e. can the purchaser afford it)?
3.      Is it practical for the system to be built?
 
     Do we have the technology to construct it?  This question is almost a misnomer, it is rare to find a system that we cannot construct with the tech level that we currently have ... but there will be times when technology will be a limiting factor.  More than likely, however, the technology will be there, it is just a matter of deciding if the cost can be justified...
     Fiscal feasibility.  Is the gain(s) made by the new system worth the cost of producing the new system?  How much does it cost to maintain the current system (actual maintenance costs, lost revenue due to poor service, loss of productivity caused by waiting for the old system, etc.) 

System Analysis

In this phase, the systems analysts study the existing system in detail, and identify new requirements. Analysis gathers the requirements for the system. This stage includes a detailed study of the business needs of the organization. Options for changing the business process may be considered

System design


 Design focuses on high level design like, what programs are needed and how are they going to interact, low-level design (how the individual programs are going to work), interface design (what are the interfaces going to look like) and data design (what data will be required). During these phases, the software's overall structure is defined. Analysis and Design are very crucial in the whole development cycle. Any glitch in the design phase could be very expensive to solve in the later stage of the software development. Much care is taken during this phase. The logical system of the product is developed in this phase


Software Development

In this phase the designs are translated into code. Computer programs are written using a conventional programming language or an application generator. Programming tools like Compilers, Interpreters, Debuggers are used to generate the code. Different high level programming languages like C, C++, Pascal, Java are used for coding. With respect to the type of application, the right programming language is chosen (The design specifications are converted into source code of a programming language.)


Testing

In this phase the system is tested. Normally programs are written as a series of individual modules, these subject to separate and detailed test. The system is then tested as a whole. The separate modules are brought together and tested as a complete system. The system is tested to ensure that interfaces between modules work (integration testing), the system works on the intended platform and with the expected volume of data (volume testing) and that the system does what the user requires (acceptance/beta testing).


7 Implementation

The implementation stage of any project is a true display of the defining moments that make a project a success or a failure. The implementation stage is defined as "the system or system modifications being installed and made operational in a production environment. The phase is initiated after the system has been tested and accepted by the user. This phase continues until the system is operating in production in accordance with the defined user requirements"  While all of the planning that takes place in preparation of the implementation phase is critical and important.


7 Maintenance

Inevitably the system will need maintenance. Software will definitely undergo change once it is delivered to the customer. There are many reasons for the change. Change could happen because of some unexpected input values into the system. In addition, the changes in the system could directly affect the software operations. The software should be developed to accommodate changes that could happen during the post implementation period.

Some e-books and web sites give various definitions and explanations about phases of SDLC. Following is also an other description about phases of SDLC and it can be used as optional steps.

Types of Information Systems.

o       Office Automation System
o       Transaction processing system
o       Management information System
o       Processing control System



Office automation System.

 

 

Office Automation systems (OAS) are systems that try to improve the productivity of employees who need to process data and Information.

   Example :
           Microsoft Office Package


Transaction processing system.

  

Transaction processing systems are information system applications that capture and process data about (or for) business transaction. They are some time called Data Processing Systems (DPS).  A TPS is focused at the orational level of a         business.

The management information produced by transaction processing systems usually consists of detail reports of daily transactions or future transactions. The reports generated by a TPS are useful only to lower level managers.

A TPS usually operates only within one functional area of a business. As an example, in an organization each department, marketing, accounting and finance, production, and research and development  has its own TPS.

Main components of Transaction processing System are hardware (machines), software (instructions or programs), people (programmers, managers, or users), procedures (rules), data and information.


Management Information System.

A management Information System (MIS) is mainly concerned with internal sources of information. MIS usually take data from the transaction processing systems and summarize it into a series of management reports.

MIS reports tend to be used by middle management and operational supervisors.





Processing control system

Process control systems are used to control machine and equipments.  e.g.: cement production factory, vehicle manufacturing and assembling ,  robots etc.




Intelligent information system

 A computer application that does the work of a human experts. For example, there are expert systems that can diagnose human illnesses, make financial forecasts, and schedule routes for delivery vehicles. Some expert systems are designed to take the place of human experts, while others are designed to aid them.

Expert systems are part of a general category of computer applications known as artificial intelligence . To design an expert system, one needs a knowledge engineer, an individual who studies how human experts make decisions and translates the rules into terms that a computer can understand.






.

Types of Processing Systems


What are the types of processing Systems

            Batch processing
            On line Real time Processing




Batch processing?

Data is collected for a period of times and process in batch wise. The term originated in the days when users entered programs on punch cards. These cards are fed in to the computer in batch wise.

On line Real time processing?

A type of computer processing in which the computer responds immediately to user requests. Each request is considered to be a transaction. Automatic teller machines in banks are an example of transaction processing.

The opposite of transaction processing is batch processing, in which a batch of requests is stored and then executed all at one time. Transaction processing requires interaction with a user, whereas batch processing can take place without a user being present.


,

Let's start from Information Systems




      Introduction to systems.

What is a system?

A system is a collection of interrelated components that work together to perform a specific task or achieve a goal. In a system, the different components are connected with each other and they are interdependent. 

1System Composition

 

What is a subsystem?

 

Each component is a subsystem of the main (original) system and carries out a part of the system task.
For example, the human body represents a complete natural system. the human body contains complex muscle, bone, respiratory, digestive and circulatory subsystems, each providing a specific part of the system task. School, Bank, Library, Supermarket, are some other examples of systems.

What is system boundary?

 

A system usually interacts with the external world or environment. The system boundary separates the system from its environment. A system’s boundary tells us what is inside and what is outside the system.
            Let us consider the school for example and identify the system boundary.

What are the elements of a system?

Input
Process
Output
To perform a task or accomplish a goal, a system receives inputs (from the environment), process and return outputs (to the environment).

Organizations as Systems.

 

Can we consider organization as a System?

 

              If we look in our surroundings, we see many organizations: such as shops, medical centers, communication centers, theatres, universities and others. All of these organizations have goals, components, inputs, processing and outputs. They can be viewed as systems and analyzed to identify system boundaries, system types, environment in which they operate.

What is Information System?

Data are raw facts. Information is processed data. Information is used to take decisions. We use a process to turn data into information. A process is a set of logically related tasks performed to achieve a specific outcome. Sometimes, data are processed mentally or manually.  

 

What is Manual Information system?

In a manual Information system, all data processing is done manually. Filing cabinets, manual procedures and papers are vital components of a manual information system.
Example
• Book- keeping system
• School registration and attendance   keeping system
• Library books index system
                

What is Computer-based Information system?

     A computer-based information system is a single set of hardware, software, databases, telecommunications, people and procedures that are configured to collect, process ,manipulate, store, and communicate data into information.

 Example
• Telephone billing system
• Results produced by the department of examinations